Founded in
Annual production
Employees
Factory area
We take your brand philosophy and target audience into consideration, defining key elements such as size, material, functionality, and design. Simply provide us with an idea, sketch, or reference image, and we'll deliver a professional solution.
Once the product design is finalized, we quickly initiate the proofing process, using the same materials and processes as the production run. Prototyping typically takes 5-10 working days, and is carried out simultaneously with mold development requirements.
After the sample is completed, a number of simulation tests will be carried out to test components such as pull rods, universal wheels, and zippers.
We have a complete production line, including shell molding, hardware assembly, sewing lining, complete machine assembly and functional testing. The standard delivery time is generally 30-45 days.
We choose shockproof, pressure-proof and moisture-proof packaging methods according to the product structure, and also support customized packaging (brand LOGO cartons, tags, instructions, etc.).